Project Information
Location: Lima, OH
Services
3D Renderings, BIM, Schematic Design, Construction Documents, Construction Administration
Overview
The renovation of the 4th floor of Lima Memorial Hospital for a 17-bed acute rehab unit has been designed with a residential feel to mitigate the stress of being in a institutional setting. This unit includes a gym/exercise & treatment space with an Aretech ZeroG patient lift, a kitchen and living area with cognitive therapy equipment, spa and salon therapy areas, as well as additional support and office areas.